Showing posts with label Guido. Show all posts
Showing posts with label Guido. Show all posts

Monday, November 19, 2007

More Floor News

This Guido (the disappearing floor guy) is a real ass. Excuse the language but you will understand in a minute.

Through the guy who gave us his name (thanks?) we found out where the tile we have at our house so far was purchased because he picked the stuff for us up in his truck. Jim decided we could finish this job ourselves and I was willing to help him try so off we went on Saturday to the supplier. We had a sample and explained about the abandoned job and how we needed the stuff- tile, thin set and grout - to finish the job because the original tile was purchased there but not enough for completion and we needed a match. They asked who did this to us and right away there was a reaction to the name and it wasn't a good one. It seems that even thought we gave Guido the money to buy everything needed for the job he wrote the tile suppliers a bad check. Now you get the ass part right?

The tile folks were very kind and we got what we needed at the contractors price which I thought was generous. From the customer service there I can recommend Tanner Materials if you are looking for tile or stone for your home. They are on Arizona Avenue in Chandler.

We started on Saturday and worked through last night and made quite a bit of progress for two people learning as we worked. Jim is cutting and laying tile. My job was to get the glue from the kitchen floor that adhered the old sheet vinyl. We were told thin set won't work well on top of that glue and it had to be removed. I also grouted the hallway and a couple of spot left undone in the master bath.

We won't be done by Thanksgiving but we have taken charge of the job, our home and our lives and it feels good, sore muscles, knees and all.

Thursday, November 15, 2007

More of My Floor

I fear that this job has been abandoned by the Guido. He asked for money on Tuesday. The response he got from us was that we needed to see the rest of the materials for the job before we gave him anymore. He has agreed to this and this has been the same response for more than a week. At the beginning of the job we were told that all materials were paid for and being held in his name. We told Guido that we wanted the supplies here. Each time he had some reason why the materials won't be here today but maybe tomorrow.

At about 10:30 Tuesday morning he left without a word which wasn't that unusual to finally, I hoped, get the rest of the stuff for the job. I was expecting to see tile, grout, and thin set in my garage by that afternoon. He never returned. Jim called and left voice mail on his phone and the call was never returned. He didn't show up yesterday or so far this morning. The living room is about 2/3 done. The hallway has tile down but no grout or sealer. The kitchen has not been worked in at all. This should be a Thanksgiving to remember and laugh about but the way I feel about this right now it won't be for a few years.

Thursday, November 1, 2007

The Floor Continues

Well the bathroom is all grouted and the toilet is back in place. The tiles still need to be sealed. That I am told should happen tomorrow when the grout is completely dry.

In the meantime my family room and kitchen haven't been done at all. I am sure I will love it when done but getting there is going to make me crazy.

The Guido had to leave today at 2 to pick up his van in the repair shop. Why this should cut into a workday he was hired for is more than I can understand. Oh well.

Wednesday, October 31, 2007

The Guido

Well he came about 10 a.m. yesterday with a box of grout mix. The plan was baseboards in the bathroom and grout so it could be sealed and done today. So much for plans. He had to leave at 2 p.m. for a dentist appointment because a filling had fallen out and he was in pain. I am sorry this happened to him but once again frustrated by another day basically lost.

The baseboard wasn't finished so no sealing today. He keeps wanting me to acknowledge what a hard worker he is but that is just a joke. My husband is at work before Guido gets here and isn't home until he is gone. You tell me who works a longer, harder day. One day Guido said to me that he would work late so he could get a lot done. Guess what his idea of late was- only 5:30. Jim got home from his job more than an hour later than that after a work day that started at 6:00 a.m.

I am just so frustrated by this process. I know quality work takes time but this just seems unreal.

Tuesday, October 30, 2007

More on My House

I don't know about this Guido guy. The work he has done so far seem high quality but so slow. Once again yesterday he told Jim he would be finished in 2 weeks. I just don't understand how that can happen. The master bath is not complete yet and tomorrow is the end of the first week. He still has hallway, family room, kitchen, fireplace and entry to do. I am afraid this guy will be here till Christmas. I don't know how he can make a living with the amount he bid the job at.

I am finding it difficult to get much done as well. The guy is afraid of dogs so I spend a lot of my day keeping my dog and him apart. Patches has always been a house dog and is wondering why I keep throwing him out in the backyard all day. Even with food water and treats he cries and barks to come in and can keep that up for hours. I started taking crocheting projects outside and sitting with him. Does this sound silly-trying to keep a dog calm and quiet? If I come in the house then Guido wants to start talking which keeps him and me from getting anything done. I would rather he go faster and I stay with the dog and crochet. Besides I like my dog better.




The picture above is Jim not Guido taking out the kitchen floor. Removal and hauling away was supposed to be part of the job. At this point I think Jim will do anything to speed up the process so we pulled carpet, laminate floor, vinyl, baseboards and tack strips and hauled it all away. Patches didn't mind because he got to watch this part of the job.

God I hope this doesn't turn into the disaster I am afraid it will be and please let the Guido be done and gone by Thanksgiving because I am not silly enough to think that 2 weeks is going to happen.